Commissioning Manager Resume Example

Checklist layout: a tick-box commissioning ladder from mechanical completion to handover, systems stats and a handover table for commissioning and start-up managers.

Use this example Template: Commissioning Manager

Hassan Zahrani

Commissioning Manager — Utilities & Infrastructure
hassan.zahrani@example.com+966 56 555 0348Jeddah, Saudi Arabialinkedin.com/in/hassanzahrani-cx

Summary

Commissioning manager with 13 years taking power, water and district-cooling plants and large buildings from mechanical completion to safe handover. I write commissioning plans and system-by-system test procedures, run pre-commissioning, energisation and performance tests with contractors and vendors and close punch lists so operators accept the asset with confidence. Recent work: a 600 MW combined-cycle plant and a 100 MIGD desalination plant on the Red Sea coast.

Experience

Commissioning Manager
ACWA Power · Jeddah
Jan 2019 – Present
41Days ahead of COD
1,850Systems handed over
  • Led commissioning of a 600 MW combined-cycle plant: 1,850 systems, 70 engineers and 4 EPC contractors; commercial operation 41 days early
  • Commissioned a 100 MIGD reverse-osmosis desalination plant, including intake, pre-treatment, 24 RO trains and 380 kV grid connection
  • Introduced a digital completions system (GoTechnology) replacing paper ITRs; punch-list closure time cut by half
Commissioning Engineer — Electrical & I&C
Siemens Energy · Hamburg
Jun 2012 – Dec 2018
  • Commissioned gas turbines, HV switchgear and DCS for 5 power plants in Germany, Egypt and Iraq
  • Wrote loop-check and protection-relay test procedures adopted as company standard

Handover ladder

StageGate
Mechanical completionA-ITRs signed
Pre-commissioningFlushing, loop checks
CommissioningEnergised, dynamic tests
HandoverPerformance test, O&M docs

Summary example

Commissioning manager with [N] years taking power, water and district-cooling plants and large buildings from mechanical completion to safe handover. I write commissioning plans and system-by-system test procedures, run pre-commissioning, energisation and performance tests with contractors and vendors and close punch lists so operators accept the asset with confidence. Recent work: a [N] MW combined-cycle plant and a [N] MIGD desalination plant on the Red Sea coast.

Example bullet points for a Commissioning Manager

  • Led commissioning of a [N] MW combined-cycle plant: [N] systems, [N] engineers and [N] EPC contractors; commercial operation [N] days early
  • Commissioned a [N] MIGD reverse-osmosis desalination plant, including intake, pre-treatment, [N] RO trains and [N] kV grid connection
  • Introduced a digital completions system (GoTechnology) replacing paper ITRs; punch-list closure time cut by half
  • Commissioned gas turbines, HV switchgear and DCS for [N] power plants in Germany, Egypt and Iraq
  • Wrote loop-check and protection-relay test procedures adopted as company standard

Replace the [brackets] with your own numbers and facts. Never claim results you didn't achieve.

Skills to include

  • Cx plans & procedures
  • Energisation & LOTO
  • Performance testing
  • Punch-list & handover
  • GoTechnology
  • Siemens SPPA-T3000
  • Omicron CMC
  • Primavera P6
  • Power BI

Tips for a Commissioning Manager resume

  1. Put the hard requirements recruiters screen for in the top third: Cx plans & procedures, Energisation & LOTO, Performance testing.
  2. List current credentials with the issuing body, e.g. Certified Commissioning Professional (CCP), NEBOSH International General Certificate.
  3. Give every recent role at least one measured result — for example days ahead of cod.
  4. Match the job title in your headline to the posting where it is honest to do so.
  5. Run the built-in resume checker and paste the job description into the keyword match before you download.

Related: How to write a resume · Action verbs · All templates

Make this example yours

Build my resume — free